MEP Coordination

MEP is coordinated against the structure before first fix, so sleeves, chases and openings are cast in rather than cut out later. Testing is completed and witnessed before closing any ceiling or wall.

All services
Cast-in wall sleeves and outlets within reinforced tank walls
Cast-in sleeves and outlets positioned with the steel, not cut afterwards.
Underground drainage and conduit stub-ups at foundation level
Below-slab drainage and conduit stub-ups set and surveyed before pour.

Scope of works

  • Builder's work openings, sleeves and cast-in items
  • Electrical containment, conduits, DBs and final fix
  • Water supply, drainage and sanitary installation
  • HVAC ducting, split/VRF units and ventilation
  • Testing, commissioning and authority inspections

Engineering detail

Standards we work to

Pressure test
Water lines tested and held per authority requirement
Drainage
Gravity lines laid to specified fall and ball-tested
Electrical
Insulation resistance, earth continuity and loop tests recorded
Coordination
Combined services drawing signed before first fix